All Tasks
View and manage all tasks across projects
Filters & Grouping
Active Tasks (113)
To Do (108)
| Task | Due Date |
|---|---|
| Final Exterior Prep | Oct 9 |
| Final Interior Clean | Oct 9 |
| Engine Bay Cleanup | Oct 2 |
| CNC Front Jack Pad Adapters | Oct 6 |
| Re-install Hood Badge | Oct 6 |
| Install Skidplates | Sep 30 |
| 928 10 Speaker Set - Design and Production Estimate | Oct 1 |
| Touchup Paint on door Bottom (where tabs were sanded off) | Sep 22 |
| Touchup Paint on door Bottom (where tabs were sanded off) | Sep 22 |
| 3D Scan and CAD Center Console Parts | - |
| Make Cupholder | - |
| Design STROSEK center Gauge | Sep 22 |
| Woven Leather Production Files and Budget | Sep 22 |
| Dash Vent // 3D Scan and CAD Design for Vents | Sep 11 |
| 3D Scan and CAD for Rear Seatbelt Trims | Sep 11 |
| Redo Renders and Add Console | Oct 16 |
| After Paid // Ship Woven to client | Sep 11 |
| Finalize Production Plan for 911 Ice Green | Oct 2 |
| Replace 1st Floor Bathroom Fan | - |
| Drill holes and deck lid to drain water | Oct 8 |
| Product Production Docs for Dave | Sep 11 |
| Fix Pier in Pond / Align | - |
| Produce and Cover Center Console | Sep 11 |
| Backdate Dash with Pasha Insert | Sep 4 |
| 3D Print ASA Center Console Parts | Sep 4 |
| Finalize Center Console / Fit Woven to sides and final production parts | Sep 4 |
| Kitchen Sink New Drains/Trim | - |
| Screen Porch Corner Wood | - |
| Refigerator and Appliance Clean | - |
| Repaint/Touchup Pocket Doors | - |
| Install Shop Rear Light by Garage door | - |
| Fix and Paint Living Room Baseboard by Ruby | - |
| Install Some Lights in Wine Cellar | - |
| Declutter Rooms | - |
| Basement door Trim Top of Stairs | - |
| Fix Drywall by Basement Stair Railing | - |
| Fix and Install Exterior Screens | - |
| Trim and Shape Boxwoods | - |
| FOR PICTURES | Sep 1 |
| Install Exterior Outlet Covers | - |
| Clean up Wiring in Electric Room | - |
| Fix and Paint Garage Drywall | - |
| REPLACE Carpet in Living Room and Stairs | - |
| Blast all Bee Nests from Eaves | - |
| Powerwash | - |
| Clean Walls/Baseboards | - |
| Interior Painting | - |
| Trim Birch Trees | - |
| Remove Sand from Beach and Add sand to clean up | - |
| Paint and Fix Exterior Trim | - |
| Sent Samples for Approval // Requested Materials and Parts | Oct 30 |
| Fix Chrome on AK Lights | Sep 2 |
| Frunk hood struts, paint all black | Sep 2 |
| Design 993 // Garage 223 Gauge Faces | Aug 17 |
| Ventelation Fan Speed not working | Sep 2 |
| 3D Models of Interior Ideas | Oct 30 |
| Install new door seals (all cut up) | Sep 2 |
| Order Backdate Heat Parts | Sep 2 |
| Backdate Heat Pipe (Clamp to Motor) | Sep 2 |
| Design and Prep Materials list for Sport Muffler Conversion | Oct 16 |
| Clicking Noise Driver Rear // Not Brakes | Jul 31 |
| Finalize Knobs Needed and Designs | Oct 2 |
| Render Mockups | Oct 1 |
| Ride Height | - |
| Production Docs for Upholsery | Oct 1 |
| Production Docs and Plans for Build | Aug 14 |
| BUILD And Ship Lights to Mike Jacobs | Oct 23 |
| Burn Cardboard | - |
| Compressor | - |
| Assess whole car for Pre-Sale Checklist (ADD TASKS) | Sep 2 |
| Engine Tune Fixes and Checks | Sep 2 |
| Need new Light Switch Cover/Knob (old pops off) | Sep 2 |
| Make 2 more keys for Dan // Speed Hole | Sep 2 |
| Look at gas cap and reset tighness | Sep 2 |
| Install New Seat Belts // Black | Sep 2 |
| Get front end alignment done pull to the left | Sep 2 |
| Rear Decklid / Fix lineup | Sep 2 |
| New/Missing Wheelwell | Sep 2 |
| Fix parking brake arm | Sep 2 |
| Recoat and fix install of sill plates // Chipped | Sep 2 |
| Clean Up Exterior | Sep 2 |
| Fix Carpet areas (Front and Rear) | Sep 2 |
| Order 20mm Sway Bar Bushings | Aug 1 |
| Cover new Frunk Panels and Install | Sep 2 |
| Cover Roll Cage areas in Leather and Alcantara | Sep 2 |
| New old school windshield wiper blades | Sep 2 |
| Fix Shifter / Losse and missing a set screw | Sep 2 |
| Fix Front Seat Mounts and Angles | Sep 2 |
| Mold New seat bottom pads | Sep 2 |
| Close off oil cooler sides | Aug 1 |
| Rough Budget and Timing Approach | Jun 24 |
| Mock-up 356 speedster interior | Nov 20 |
| Need Seat ETA from Dave // Vintage Stitch | Aug 10 |
| Install New Front Turn Signals | Aug 1 |
| Build Reviews for Design Elements | Oct 16 |
| Production/Build Plan | Oct 30 |
| Design Comps | Oct 30 |
| Develop Production Reviews for Project Decisions | Oct 16 |
| Followup on Woven Order | Mar 6 |
| Followup On woven Order | Mar 6 |
| ATS2 // PRODUCTION CHECKLIST | Oct 23 |
| Momo Steering Wheel and Parts for Install | Oct 1 |
| Test Model Bolster Options | - |
| Send Calipers to PMB | Aug 1 |
| Setup Meeting to Review | Apr 4 |
| Budget With Dave | Oct 1 |
| Drain Air Compressor | - |
| Produce Rear | - |
In Progress (4)
| Task | Due Date |
|---|---|
| RSR Front Bumper Fix | Oct 8 |
| 914 // Sport Seat Mockups and Test | Aug 14 |
| Document Specs and Design Connections | May 16 |
| Remove Carpet | Aug 1 |
QA/Test (1)
| Task | Due Date |
|---|---|
| Fix Sunroof deflector | Jun 18 |
Completed Tasks (343)
Done (343)
| Task | Completed |
|---|---|
| Repair Driver Front Mudflap | Oct 7 |
| Send Finish Samples to Sasha | Sep 25 |
| Rewire Turbo Blanket on Pass Turbo | Sep 15 |
| Final Invoice Wait for Paid | Sep 11 |
| Send Production Docs to Kendi once Paid | Sep 16 |
| Swap to 964 oil temp gauge | Aug 26 |
| Squeaky pedal box | Aug 27 |
| Blue Wire / Make Speakers work on all time | Aug 27 |
| Install New Cookier Cutters Exhaust | Aug 27 |
| Engine Bay Vacumn Canister Fix | Aug 24 |
| Rear Light Fix (Check Wiring and Reinstall Pass) | Aug 27 |
| Send RS Carpet kit to Dan Fitz | Sep 1 |
| Touchup front Control Arms | Aug 27 |
| Change oil sender | Aug 24 |
| Paint rear torsion arms | Aug 26 |
| Paint rear trailing arms/touchup oil lines | Aug 27 |
| Rust covert oil lines and paint | Aug 24 |
| Add metal skid sleds | Aug 26 |
| Driver door Pull Strap // Opening Shows (move handle up) | Aug 24 |
| Diagnose O2 Issue and Test PLX Wideband, replace and test new | Aug 19 |
| Replace Fuel Sender | Aug 19 |
| Send Approval to Kendi on Payment | Sep 1 |
| Order New Set of Tires for RSR | Aug 25 |
| Test and Fix Fuel Low Light | Aug 19 |
| Trace wire for oil temp gauge // Not reacting to temp increase | Aug 19 |
| Tweak suspension setup | Aug 27 |
| Define Woven Leather needed for Seats | Aug 11 |
| Production Documents for Dallas 5762 | Aug 15 |
| Idle Switch Adjust Stop | Aug 14 |
| Templates and Sewing Upper Rear Seat Inserts | Aug 20 |
| Heat not flowing (need to trace flow where it stops) | Aug 27 |
| Touchup Undercoat (Rockers/Wheelwells/Misc) | Aug 11 |
| Reinstall Clock/Oil Gauges | Aug 14 |
| Passenger rear quarter/ Touchup, Wetsand and Buff chip | Aug 27 |
| Upholster Rear Lower Seats | Aug 7 |
| Scuff pad oil lines and corroded areas | Aug 7 |
| ROLL PASS REAR FENDER for clearance | Aug 27 |
| Test Sew out of Red Stitching on Panels | Aug 8 |
| Design Center console and Share | Aug 15 |
| Mockup New Panel Variations | Jul 27 |
| Work with Classic Retrofit to Fix AC Intermitent | Aug 7 |
| Setup Production Kickoff Call with David | Sep 4 |
| Custom Fit Woven Leather in Dash | Aug 11 |
| CNC Radio Plate to Match Early Car (Clients) | Jul 28 |
| Send Leather Samples of Colors REAL | Jul 24 |
| Touchup Decklid Grille Paint | Sep 15 |
| Install Interior Door Panels and Pockets | Oct 1 |
| Send Congac Leather Samples | Jul 24 |
| Fix Seat Belt Rattle | Jul 29 |
| Install Engine Bay Cover Pieces | Aug 7 |
| Create Templates and Recover Inserts for Sport Seats | Aug 7 |
| Make and Install Seatbelt guide behind Console | Aug 3 |
| Drain Oil and Seal Engine | Sep 15 |
| Clean Engine Compartment and undercarriage for sale | Oct 1 |
| Wire up and test HORNS | Jul 31 |
| Re-Glue Woven edges to panel & Re-VHB Driver door Trim | Jul 27 |
| Polish Gauge Glass/Remove Scratches | Jul 26 |
| Check why Tach Bounces (check 2nd ground wire) | Jul 30 |
| Install rear bumper | Aug 6 |
| Test and Fix Pass and Driver Pull Strap (too tight) | Jul 30 |
| Pull and Repaint Rear Decklid Grill | Sep 25 |
| O2 Sensor Replace and Fix | Jul 21 |
| Setup Order // Lorry 5632/Linea 624Blue color | Jul 27 |
| Order Carpet kit from Newark | Jul 28 |
| Order Leather for Seats (2 hides) | Aug 13 |
| Order Plaid Fabric for Seats and Rears | Jul 28 |
| Put ATS1 on Lift to identify any Rusty/Bad Parts | Sep 25 |
| Satin Finish Speakers and Install Grilles for Shipment | Jul 21 |
| Inspect and tweak any car stripes / graphics | Aug 27 |
| Send Matching Leather Samples to Vehicle Experts | Jul 21 |
| Install Front Lights | Aug 5 |
| Build Front Lights | Jul 31 |
| Cover Frunk Panels with Leather and Carpet | Jul 20 |
| Mock-up final gauges for approval | Sep 11 |
| Find vendor for 993 // 10k tach | Sep 22 |
| Build new Door Panel when Woven is Delivered | Aug 10 |
| Pack and Ship Covered Parts | Aug 19 |
| Speaker Grills for 1970 (Chrome Set Woofers and Tweeters) | Aug 19 |
| CNC Backdate Dash Panel for Early Car | Aug 11 |
| Repowdercoat Door Handle Plates | Jul 15 |
| Order Vinyl for Antracite Grey ITEM#: QB695J Fani 12 yards | Jul 20 |
| Order Vinyl Active Foam (Madrid) MAS-9830 BLACK | Jul 15 |
| Prep Door Panels and Pockets for Covering | Sep 1 |
| Order Texture Vinyl from Active Foam | Jul 15 |
| Build Custom Door Panels and Pockets | Sep 1 |
| Make Foam Templates for Sport Seat Inserts | Aug 7 |
| Take Inserts Out of OG Seats | Aug 7 |
| Touchup door sills | Aug 7 |
| Carpet Edging | Jul 30 |
| Change Woven Stripes | Aug 27 |
| Qoute | Aug 19 |
| Designs Done and Approved | Aug 19 |
| Heater Control Trim | Sep 1 |
| Design Slotted Oil Cooler | Aug 19 |
| Order Grand Prix White | Jul 14 |
| Order Recaro LX Used Set | Jul 14 |
| Send Sample Woven and Color Samples for Leather | Jul 13 |
| Send downpayment Invoice to Alex | Jul 14 |
| 12x24mm Woven Production Docs to Kendi | Jul 14 |
| Install Classic Windshield Wipers | Sep 15 |
| Door Panel Production | Sep 16 |
| 993 Backdate Dash Production | Sep 11 |
| Final Muffler Install and Testing | Jul 26 |
| Fix Rear Windshield | Jul 21 |
| Order List | Jul 14 |
| Tighten Center Caps on Wheels | Jul 13 |
| Fix Gas Cable | Jun 30 |
| Mockup 24mm x 12mm Woven Sample | Jul 14 |
| Check on Woven Production | Sep 2 |
| Check on Production | Sep 1 |
| Check on Production | Sep 2 |
| SEND PRODUCTION DOCS | Jul 1 |
| Rattle in Driver Door | Jun 30 |
| CNC Speaker | Jul 16 |
| Re-VHB Rear Bumper Trim | Jul 23 |
| Alternator Light Comes on/off | Jun 30 |
| Install main glass trim pieces | Jul 21 |
| Install windshied wipers | Jul 30 |
| Delivery Prep | Aug 27 |
| Detail car | Aug 27 |
| Send final invoice | Aug 27 |
| Send Production Docs to Weave | Jun 29 |
| Wet sand hood edge and bumper edge | Aug 27 |
| Install Muffler | Jun 30 |
| Clean and Touchup Brake Calipers | Jul 23 |
| Update Production docs / Send to Production | Jun 29 |
| Replace door sills | Jun 19 |
| Install rubber plugs for door frame bolts | Aug 7 |
| Upholster and Install Front Seats | Jul 14 |
| Make Appt for AC Charge and Alignment | Jun 29 |
| Raise Ride Height by 1/2 inch | Jun 26 |
| Install Final Frunk Panels | Jul 26 |
| Pull Rear Seat Delete and Fix Bumps | Jun 22 |
| Paint Horn Grill Backer/Fender Black | Jun 18 |
| Woven Leather Production Docs | Jun 29 |
| Adjust tps for idle and start | Sep 25 |
| FINALIZE PRODUCTION DOCS | Jun 16 |
| Oven | Jun 2 |
| Vacuum Maintenance | Jun 2 |
| Twist-X Exhaust | Jul 10 |
| ATS1 Skid Plate | Jul 10 |
| ATS2 Door Frames and Trim | Jul 12 |
| ATS1 Pair Door Sills | Jul 12 |
| GTS1 Pair Door Sills | Jul 12 |
| Pravi Door Sills - Pair Stock Sills | Jul 12 |
| PAINT / EXTERIOR | Jul 15 |
| Replace Door Frames with Solid Chromed Ones | Jul 21 |
| Clean Roll Cage to assess damage to be covered | Jul 15 |
| Install Center Caps | Jul 21 |
| Strip and Make New Rear Quarter Tops | May 28 |
| Door Panels (Pair RS Raw - NEED TO SEND A RAW SET | May 28 |
| Lower Rear Seats - NEED TO MOLD A SET | May 28 |
| Bring Parts to Dave for Covering | May 28 |
| FIND AND Fix Rattles | May 26 |
| Check transmission fluid | Jul 20 |
| Install Carplay Screen? | Jul 20 |
| RADIOS // FInd and Charge them all | May 26 |
| Install Engine Mounts | May 25 |
| EVENT // RUCHLOS PACK LIST | Jul 20 |
| TURBO // RUCHLOS CAR PACK LIST | May 25 |
| Pack a set of CIS clips for Michael Lisse | May 26 |
| Install new front swaybar bushings | May 26 |
| DESIGN COMPS | Jun 3 |
| Send Synthetic and Real Leather Options | May 19 |
| Develop Production Document // Budget | May 19 |
| Invoice 11” gtk | May 19 |
| Order Plaid Sample | May 19 |
| Make Pocket Straps // Tan with Tan Stitching | May 19 |
| Make Pocket Straps // Tan with Tan Stitching | May 19 |
| Send Leather Samples | May 19 |
| Hook up rear heater pipe from exhaust | May 20 |
| Wastegate Hose Clamp // Replace new one | May 26 |
| Remove Engine | May 16 |
| Finish Audio Wiring | Jul 13 |
| Re-Powdercoat Door Sill Plates | Jul 10 |
| SHIP 964 Parts | Jun 4 |
| Fix front Hood Strap Mounts | May 25 |
| Clean and Respray Air Filter | Jul 20 |
| Clean and Wash Car | Jul 20 |
| Check Pedal Box for Tightness | May 25 |
| New Cup Holder setup | May 26 |
| Check Shifter bolts | May 25 |
| Change Oil and Filter | May 16 |
| Install Door Seals | May 28 |
| Powder coat skid plate | Jul 16 |
| Call ice blaster on Engine Bay | Jun 29 |
| GTS Punchlist from Dan M | May 26 |
| Fix Passenger Door Strap // Internal plate is broken, needs new strap mechanism | Oct 1 |
| Repolish Shifter Knob | May 18 |
| Cerakote Exhaust Twist-X, Pipes and Cookiecutter tips | Jul 10 |
| Order Samples | Jun 11 |
| Ship all Leather, Woven and Parts | May 12 |
| Order RSR Porsche Badge for hood | May 18 |
| Fix Shorted Wire for Driver Turn Circuit | May 21 |
| 3D Renders of Plaid in Car | May 2 |
| Develop Design Comps for Vision | May 7 |
| DESIGN COMPS | Jun 8 |
| Build Rear Taillights | Jul 31 |
| Touchup Paint | Aug 7 |
| Rennline Hood Struts | May 7 |
| Spare Tire Holddown // AK Round | May 4 |
| Install Raven S Headlights | May 21 |
| INSTALL Door Stop Custom Mechanisms | Jul 14 |
| Replace Drivers Lock Rod | May 1 |
| Passenger Door Frame // Assemble and Install | May 7 |
| Install Front Bumper and Rubber Trim | Apr 28 |
| Install Front Hood Hold-downs | May 4 |
| INSTALL Gauges and Test | Jun 11 |
| Custom 1980 SC LHD Floor Boards | May 12 |
| Build Door Pockets with Handles | May 12 |
| BUDGET WOVEN and UPHOLSTER | Apr 14 |
| Rear Lower Seats 964 | May 12 |
| Door Panels and Handle/Pockets to Dave Vintage Stitch | May 12 |
| Order 3 more yards of Red Vinyl | Apr 14 |
| Door Panels and Handle/Pockets to Dave Vintage Stitch | Apr 29 |
| Lower Rear Cushions | Apr 1 |
| Send Downpayment for Woven Leather Produciton | Apr 14 |
| Send center console parts | Mar 26 |
| Send the Wheels and Tires to Bob | Mar 26 |
| Send Solid Hides and Alcantara to Olsen 1st | Apr 28 |
| Chris S // AK Door Pocket Production | Apr 14 |
| Order Woven Leather // Prep Part Orders | Mar 16 |
| ORDER WOVEN LEATHER // Sanctuary Speed | Mar 16 |
| ORDER // Woven Leather Olsen | Mar 16 |
| Send Steve Speaker Recos | Mar 1 |
| Black Window Cranks with solid black inserts | Jun 25 |
| 5.25" Speaker Spacers | Jun 25 |
| Make Door Pull Staps // Black Black | Jul 14 |
| Cover Singer Style Pockets // Texture leather skived | Jun 23 |
| Build woven door panels | Jun 23 |
| ORDER Woven Leather // Black w/Green Stripes | Mar 16 |
| Send Invoice for Woven Leather | Feb 26 |
| Powder Coat Fan | Mar 10 |
| Define Specs and Measurments for CAD | Feb 27 |
| Budget lights and other parts | May 4 |
| Budget for lights | May 19 |
| Send Solid Leather to Sonderwerks | Mar 3 |
| Create Estimate to Share | Feb 25 |
| Send Woven and Viper Green Samples | Feb 19 |
| Send Leather Samples to Client | Feb 18 |
| Develop Budget for Car and Materials | May 19 |
| Schedule Recaro seat fix | Mar 4 |
| Order 3.8 Engine Heater Shroud | Mar 4 |
| Order Heater Control Arms | Mar 4 |
| Prep parts and ship to Erik Lind | Feb 11 |
| send color samples to client | Feb 9 |
| Send Leather Samples to approve | Feb 5 |
| Send Leather Samples for Woven | Feb 5 |
| Reinstall Windshield | May 28 |
| Remove and Prep Dash for Recovering | Feb 4 |
| Remove Windshield | - |
| Sew Black and Black Pocket Starps | Feb 4 |
| Make GTS Production Checklist | May 26 |
| Refurbish Old Seats | May 26 |
| RePaint // Fender and Blend or full? | May 11 |
| Send Color Samples to Client for Review | Feb 3 |
| Inventory and Catalog Parts | Feb 6 |
| Build Wiring Harness for GTK // Toggle Switch | Mar 4 |
| Order RECARO SEAT WEBBING/ RUBBER DIAPHRAGM MAT Compatible with LX/LS's | Jan 29 |
| Floor Mat Production // Black with Black Edging | Feb 18 |
| Center Console Final Assembly | Jan 29 |
| 914 Seat Design Comps // Rd1 | Feb 10 |
| Final Door Panel Fitment // Pockets, Trim Bars, Pulls, Pull Trim | Jan 29 |
| Ship Parts to Matt | Feb 6 |
| Order Red For 101 seats | Jan 29 |
| Seat Fabric Design // Mockup Classic Rallye Images | Feb 3 |
| ORDER // Custom Decklid Grill | Mar 4 |
| Door Panel Installation | Jul 30 |
| Fabricate Speaker Trims | Apr 10 |
| CNC Door Handle Trims and Main Pull | Apr 9 |
| Order Audio Parts | Mar 4 |
| Order 1.75" Bursch Headers with Heat | Mar 4 |
| Create Mockups for Interior | Jan 20 |
| Order Rennshiter for RSR | Mar 4 |
| Wireless Audio and Speaker Installation | Apr 16 |
| Finish and Powdercoat Shifter Knob | Mar 18 |
| Change Specs to Final Selected Colors | Jan 20 |
| Install Rear Lights | Aug 6 |
| Final Test/Confirm Function of Electric AC | Jul 23 |
| Make Red R13 and Black Stitch Pocket Straps | Feb 18 |
| Test Fit Cut Pipes and send for approval | Jan 14 |
| Merch Orders // Define T-Shirts, Hats, Overalls | Jun 11 |
| Define Food Plans and Budgets | Jun 11 |
| Cut and Weld up 3.5 inch tips | Jan 16 |
| Canann Contract and Budgeting | Jun 11 |
| 2026 Logo and Brand Development | Jun 11 |
| Order Recaro Pole Positions and Mounts for 993 | Jun 18 |
| Order Woven and Leather | Dec 18 |
| PowderCoat Gold | Jan 14 |
| 3D Scan Raw Seat for baseline | - |
| Install Doors | - |
| Revise 3D Mockups with 1239 Darker Solid | - |
| Make Production Document for Dave W | May 18 |
| Prep 993 handles for paint | Nov 27 |
| Duabai RSR Raw Pockets | Jul 11 |
| Owen Dickenson // parts list | - |
| Erik Lind // twist x exhaust budget | Jan 14 |
| Mike Jacobs // 2nd Fog Light Set | Jan 14 |
| Get Dan to Send Parts | Jan 30 |
| Order Pair of Valleunga Seats | Dec 5 |
| ORDER Scheel-Man Traveler-R | May 12 |
| Order Scheel Mann 101's | Dec 18 |
| Mold and Build // Rear Splitter for Install | Jun 15 |
| Final Tweaks For Rear Splitter | Apr 10 |
| Mount Front Bumper for Body Shop | Apr 14 |
| Split Front Bumper // Remove center 2" | Jan 26 |
| Fix/replace muffler | May 12 |
| Fix roof rack | May 25 |
| Replace Clutch cable | May 12 |
| Seat Spacers | Nov 14 |
| Replace Driver Reverse Bulb | Nov 14 |
| Adjust Gas Pedal Height Back to Old | Nov 14 |
| Passenger Air Bag Disable | Nov 14 |
| Clean Shop for Monday Client | Nov 18 |
| Rear Qtr // Strip and Prep Panels | Jan 14 |
| AK Aero Flag Mirrors // Custom Blue | Jan 29 |
| Test Blue for Mirrors | Jan 22 |
| Rear Qtr Panel | Jan 26 |
| Door Tops and Rear Qtr Tops | Jan 17 |
| Rennline Kneepad // Smooth Blackl | Jan 26 |
| Rear Firewall Panel // Woven | Jan 24 |
| Test Gold Colors for Approval | Dec 3 |
| Door Panels // Inset Woven + Low Pocket | Jan 26 |
| Custom Inset Door Panels // Order Parts | Jan 9 |
| Backdate Dash // 1979 SC // Gold | Dec 18 |
| Low Profile Center Console // 3D Print | Jan 14 |
| Custom Shifter Knob // Rennshift | Jan 17 |
| Upholster Hardback seats | Jan 30 |
| Prep Custom Lower Rear Seats | Jan 9 |
| Prep Rear Firewall Panel // Strip and Fabricate | Jan 17 |
| Order Napa Black 622 Leather Hides | Nov 17 |
| Wash Windows | Dec 2 |
| Wash Car | Dec 4 |
| Drink beer | Dec 23 |
| Assess Install Process for AC Unit | May 5 |
| Scan Rear Grille | Dec 2 |
| 964 Backdate Dash | May 4 |
| Touchup Paint Chips | Dec 18 |
| Airbag Disable | Nov 14 |
| Fix Door Pull Openers | Dec 2 |
| Fit new Wheel To Car | Nov 14 |
| Test Task Paint prep | May 4 |
| Remove Seats | Nov 13 |
