TECHNICIAN QUEUE

My Queue · 113 tasks

🔧Working On
3
RSR Front Bumper Fix
In Progress
10/84h
914 // Sport Seat Mockups and Test
In Progress
8/141h
Document Specs and Design Connections
964 GT3 ExhaustIn Progress
In Progress
5/16
✅Ready to Start
95
3D Models of Interior Ideas
Ready
10/301h
Design and Prep Materials list for Sport Muffler Conversion
Ready
10/161h
Clicking Noise Driver Rear // Not Brakes
Ready
7/311h
Close off oil cooler sides
Ready
8/1
Install New Front Turn Signals
Ready
8/1
Order 20mm Sway Bar Bushings
Ready
8/1
Redo Renders and Add Console
Ready
10/16
Followup On woven Order
Ready
3/6
Followup on Woven Order
Ready
3/6
ATS2 // PRODUCTION CHECKLIST
Ready
10/232h
Finalize Production Plan for 911 Ice Green
Ready
10/20.8h
Finalize Center Console / Fit Woven to sides and final production parts
Ready
9/42h
3D Print ASA Center Console Parts
Ready
9/42h
Backdate Dash with Pasha Insert
Ready
9/44h
Produce and Cover Center Console
Ready
9/114h
Need Seat ETA from Dave // Vintage Stitch
Ready
8/100.3h
Build Reviews for Design Elements
Ready
10/161h
Develop Production Reviews for Project Decisions
Ready
10/162h
Production Docs for Upholsery
Ready
10/11h
Render Mockups
Ready
10/11h
Budget With Dave
Ready
10/11h
Momo Steering Wheel and Parts for Install
Ready
10/10.3h
Production Docs and Plans for Build
Ready
8/140.5h
After Paid // Ship Woven to client
Ready
9/110.3h
Product Production Docs for Dave
Ready
9/11
Mock-up 356 speedster interior
Ready
11/201h
Test Model Bolster Options
Ready
Ride Height
Ready
Touchup Paint on door Bottom (where tabs were sanded off)
Ready
9/220.3h
Install Skidplates
Ready
9/302h
Engine Bay Cleanup
Ready
10/21h
CNC Front Jack Pad Adapters
Ready
10/62h
Re-install Hood Badge
Ready
10/62h
Final Exterior Prep
Ready
10/92h
Final Interior Clean
Ready
10/91h
Basement door Trim Top of Stairs
Ready
2h
Blast all Bee Nests from Eaves
Ready
2h
Clean up Wiring in Electric Room
Ready
2h
Clean Walls/Baseboards
Ready
8h
Declutter Rooms
Ready
20h
Fix and Install Exterior Screens
Ready
2h
Fix and Paint Garage Drywall
Ready
0.3h
Fix and Paint Living Room Baseboard by Ruby
Ready
4h
Fix Drywall by Basement Stair Railing
Ready
4h
Fix Pier in Pond / Align
Ready
1h
Install Exterior Outlet Covers
Ready
1h
Install Shop Rear Light by Garage door
Ready
0.5h
Install Some Lights in Wine Cellar
Ready
2h
Interior Painting
Ready
8h
Kitchen Sink New Drains/Trim
Ready
1h
Paint and Fix Exterior Trim
Ready
8h
Ready
4h
Refigerator and Appliance Clean
Ready
2h
Remove Sand from Beach and Add sand to clean up
Ready
4h
Repaint/Touchup Pocket Doors
Ready
4h
Replace 1st Floor Bathroom Fan
Ready
2h
REPLACE Carpet in Living Room and Stairs
Ready
1h
Screen Porch Corner Wood
Ready
4h
Trim and Shape Boxwoods
Ready
2h
Trim Birch Trees
Ready
2h
Design 993 // Garage 223 Gauge Faces
Ready
8/171h
Fix Shifter / Losse and missing a set screw
Ready
9/21h
Install new door seals (all cut up)
Ready
9/20.5h
Install New Seat Belts // Black
Ready
9/20.8h
New old school windshield wiper blades
Ready
9/20.5h
Ventelation Fan Speed not working
Ready
9/20.8h
Touchup Paint on door Bottom (where tabs were sanded off)
Ready
9/220.3h
Assess whole car for Pre-Sale Checklist (ADD TASKS)
Ready
9/21h
Backdate Heat Pipe (Clamp to Motor)
Ready
9/20.3h
Clean Up Exterior
Ready
9/21h
Cover new Frunk Panels and Install
Ready
9/22h
Cover Roll Cage areas in Leather and Alcantara
Ready
9/28h
Engine Tune Fixes and Checks
Ready
9/22h
Fix Carpet areas (Front and Rear)
Ready
9/24h
Fix Chrome on AK Lights
Ready
9/22h
Fix Front Seat Mounts and Angles
Ready
9/24h
Fix parking brake arm
Ready
9/21h
Frunk hood struts, paint all black
Ready
9/20.8h
Get front end alignment done pull to the left
Ready
9/21h
Look at gas cap and reset tighness
Ready
9/20.5h
Make 2 more keys for Dan // Speed Hole
Ready
9/21h
Mold New seat bottom pads
Ready
9/24h
Need new Light Switch Cover/Knob (old pops off)
Ready
9/22h
New/Missing Wheelwell
Ready
9/20.5h
Rear Decklid / Fix lineup
Ready
9/21h
Recoat and fix install of sill plates // Chipped
Ready
9/21h
Drill holes and deck lid to drain water
Ready
10/80.5h
BUILD And Ship Lights to Mike Jacobs
Ready
10/234h
Rough Budget and Timing Approach
Ready
6/24
Burn Cardboard
Ready
Compressor
Ready
Design Comps
Ready
10/30
Production/Build Plan
Ready
10/30
Finalize Knobs Needed and Designs
Ready
10/21h
Make Cupholder
Ready
🚫Blocked
1
FOR PICTURES
Blocked
9/11h
Blocked by: Remove Sand from Beach and Add sand to clean up
⏳Waiting
2
Fix Sunroof deflector
Review
6/18
Order Backdate Heat Parts
Parts
9/20.3h
Waiting for Heating Pipe. Porsche 964 & 993 6-8 HP More ❭ 964167003 (1 short)
📋Other
12
Send Calipers to PMB
8/1
Remove Carpet
8/1
Produce Rear
3D Scan and CAD for Rear Seatbelt Trims
9/112h
Dash Vent // 3D Scan and CAD Design for Vents
9/118h
3D Scan and CAD Center Console Parts
Design STROSEK center Gauge
9/22
Woven Leather Production Files and Budget
9/22
Drain Air Compressor
Setup Meeting to Review
4/4
928 10 Speaker Set - Design and Production Estimate
10/11h
Sent Samples for Approval // Requested Materials and Parts
10/30